METISS and IOX Submarine Cable

Internet speed in Mauritius has been sub-par compared to other countries in the region and one of the main reasons brought forward is the lack to international bandwidth capacity. As of today, Mauritius is connected to only two submarine cables in the name of SAFE (South Africa Far East) and LION (Lower Indian Ocean Network).

The first submarine cable connected to Mauritius, SAFE was put in service in 2002 and in its many years of operation, several upgrades have been performed to increase its capacity. The current capacity is 800 Gigabit per second which is shared by multiple operators in multiple countries. The cable has been experiencing several issues in the recent years requiring lengthy maintenance and a replacement for it will be needed in the very near future.

The second submarine cable, LION/LION2 was put in operation in 2009 and has a designed capacity of 1.28 terabits per second. The cable is shared by Mauritius, Reunion, Madagascar and Kenya with Orange being the major owner.


Enter METISS and IOX…


METISS, which is an acronym for MElting poT Indianoceanic Submarine System, is the first new cable announced. It was announced by a consortium of operators from multiple countries. They are Blueline, Canal+ Telecom, Emtel, SRR, Telco OI, Telma and Zeop. The cable is expected to be put into service in 2019. It was later announced that CEB FibreNet Ltd would be joining the consortium.

Initially, due to reluctance from local operators in Mauritius, the largest internet service provider in Mauritius, Mauritius Telecom was not invited to form part of the consortium. Later on, they were invited but then showed no interest since the latter decided to go ahead with IOX Cable. (Source: http://defimedia.info/mauritius-telecom-chiffre-daffaires-record-de-rs-1008-milliards)

Additionally, at CEB FibreNet Ltd, there might be a wind of change. Lately, it is rumoured that the company will invest in IOX Cable instead of METISS. (Source: http://defimedia.info/internet-haut-debit-le-ceb-prevoit-des-investissements-de-rs-200-m-rs-1-md)

Even though METISS Cable is backed by the Commission de l’océan Indien, news about METISS has been scarce…Is the project going forward? Or has it been cancelled. The islands of Indian Ocean have announced multiple projects in the recent years to introduced new submarine cable such as BRICS and others which have all been cancelled later on.

So Reunion, and mostly Zeop, get your shit together…


In Mauritius, we have another cable planned. IOX Cable, which stands for Indian Ocean eXchange, is expected to be put into service at the end of 2018 or start of 2019. The cable is backed by Mauritius Telecom (http://www.capacitymedia.com/Article/3754034/News/IOX-Cable-signs-up-Mauritius-Telecom-as-subsea-anchor-tenant) and has a design capacity of  13.5Tbps per FP…

The cable will be built in two phase. The first phase consists of connecting Rodrigues to Mauritius and then directly to the existing Seacom submarine cable in east Africa and thereafter to South Africa. The second phase will consist of extending the cable from Rodrigues to India.

IOX Cable Route

The IOX Cable might land in other countries such as Reunion or Madagascar but so far there has been no expression of interest from these countries. (Source: https://www.africametro.com/business/mauritius-iox-wants-build-international-cable-link-india-africa-not-operators-facilitators-operators)

For the funding of IOX Cable, it should be noted that most of the private equity investment is expected from Anchor Tenant operators from all connected islands, Private Equity Investors, Vendor Finance, Debt Finance & Pre-Sales

IOX Cable Update: Build agreement has been signed with Alcatel Submarine Networks – https://networks.nokia.com/news/2017/iox-cable-ltd-alcatel-submarine-networks-to-build-first-open-cable

Advertisements

1 thought on “METISS and IOX Submarine Cable”

  1. Don’t you think IOX is based on PR only ???
    Seems that there is only 1 partner right now… which is Mauritius Telecom… Seems FISHY!!!
    How will they be sustainable with only 1 operator ?

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s